ETA (projected completion time) disappeared from GUI (solved)

Moderators: Site Moderators, FAHC Science Team

Post Reply
gunnarre
Posts: 560
Joined: Sun May 24, 2020 7:23 pm
Location: Norway

ETA (projected completion time) disappeared from GUI (solved)

Post by gunnarre »

Hi,
When upgrading to 8.4.9, I noticed that the ETA (estimated completion time) of the work unit had disappeared from the web GUI.
Image

The way to solve this is to click on Accounts Settings (the person icon on the top right), Appearance, and then move the ETA column to the visible columns, then click Save.
Image
After:
Image
I like this feature but it was a bit confusing at first. ETA should maybe be part of the standard columns - for us who use the machine to play games, it helps schedule gaming sessions.
Image
Online: GTX 1660 Super + occasional CPU folding in the cold.
Offline: Radeon HD 7770, GTX 1050 Ti 4G OC, RX580
gunnarre
Posts: 560
Joined: Sun May 24, 2020 7:23 pm
Location: Norway

Re: ETA (projected completion time) disappeared from GUI (solved)

Post by gunnarre »

Image
Online: GTX 1660 Super + occasional CPU folding in the cold.
Offline: Radeon HD 7770, GTX 1050 Ti 4G OC, RX580
Post Reply