Sorry for my english, i'm not native english speaker.
I have issue with frame progress. Sometimes client doesn't write frame at the monent when it was completed but later.
For example: progress 23,6%, but in "Log" i see only 22%. 5 minutes later progress is 24,1% but then client writes 23 frame, and my progress drops to 23%
I have only 24h deadline and in this situation it seems to be unrealistic to keep this time.
Lost frames (project 11750)
Moderators: Site Moderators, FAHC Science Team
-
- Posts: 1094
- Joined: Wed Nov 05, 2008 3:19 pm
- Location: Cambridge, UK
Re: Lost frames (project 11750)
The progress is an estimate, based on recent work rate. The log entries are actual complete work. At 5 minutes per 1%, you will complete the WU in 6h20m. This is within the normal range.
24h is the limit to earn a points bonus. The actual deadline before the WU is lost is longer.
24h is the limit to earn a points bonus. The actual deadline before the WU is lost is longer.