Is there a way to abort a current WU and get a new one, without uninstalling the client? I was assigned to
Project: 9660 (1, 37, 133)
WU ETA: 2.00 days
Estimated Points: 677 -> 340 points per day. But usually it would be around 13k/day (GPU only)
So far it's the most extreme case I've seen, but certainly not the only one. Why doesn't the reward always reflect the workload? Thanks.
Abort current WU
Moderators: Site Moderators, FAHC Science Team
-
- Site Admin
- Posts: 8002
- Joined: Tue Apr 21, 2009 4:41 pm
- Hardware configuration: Mac Studio M1 Max 32 GB smp6
Mac Hack i7-7700K 48 GB smp4 - Location: W. MA
Re: Abort current WU
Yes, it is possible. But more importantly more information would be needed before recommending that. More likely is a bad setting on your system or another problem that can be corrected.
The Welcome topic - viewtopic.php?f=61&t=26036 - provides directions on how to post information about your system and the folding log to the forum. That would include much of the necessary items to determine what the problem is.
The Welcome topic - viewtopic.php?f=61&t=26036 - provides directions on how to post information about your system and the folding log to the forum. That would include much of the necessary items to determine what the problem is.
-
- Posts: 10179
- Joined: Thu Nov 29, 2007 4:30 pm
- Hardware configuration: Intel i7-4770K @ 4.5 GHz, 16 GB DDR3-2133 Corsair Vengence (black/red), EVGA GTX 760 @ 1200 MHz, on an Asus Maximus VI Hero MB (black/red), in a blacked out Antec P280 Tower, with a Xigmatek Night Hawk (black) HSF, Seasonic 760w Platinum (black case, sleeves, wires), 4 SilenX 120mm Case fans with silicon fan gaskets and silicon mounts (all black), a 512GB Samsung SSD (black), and a 2TB Black Western Digital HD (silver/black).
- Location: Arizona
- Contact:
Re: Abort current WU
Hello Dirty_Harry_R900, welcome to the Folding Support Forum.
If this is the first time the client has folded this project, the initial PPD estimates will be drastically incorrect until the client has completed 3-5 frames or percent of the work unit. Let it fold for an hour or two and see if the PPD changes.
If this is the first time the client has folded this project, the initial PPD estimates will be drastically incorrect until the client has completed 3-5 frames or percent of the work unit. Let it fold for an hour or two and see if the PPD changes.
How to provide enough information to get helpful support
Tell me and I forget. Teach me and I remember. Involve me and I learn.
Tell me and I forget. Teach me and I remember. Involve me and I learn.
-
- Posts: 86
- Joined: Wed Jan 06, 2016 4:16 am
- Location: Northern Sweden