Projects 7802 and 7803 on Advanced

Any announcements about FAH policy, servers and new projects will be made here.

Moderators: Site Moderators, FAHC Science Team

Post Reply
schwancr
Pande Group Member
Posts: 136
Joined: Wed Jun 01, 2011 9:45 pm

Projects 7802 and 7803 on Advanced

Post by schwancr »

Projects 7802/7803 now on Advanced.

These projects are related to the 7800-7801 projects. 7802/7803 are simulations with the same peptides, but without the ribosome.

These projects attempt to explore how protein folding in the cell may be different than protein folding in a test tube. We are simulating a peptide inside the ribosome exit tunnel to explore how confinement and specific interactions within the tunnel can bias the peptide toward a certain fold or even prevent the peptide from folding.

This project utilizes the A4 core and is available for Linux and Win32 Clients v6.34+

STATS:

p7802
points = 1183.12
timeout = 17.58
deadline = 29.30
k-factor = 0.75

p7803
points = 1219.2
timeout = 18.12
deadline = 30.20
k-factor = 0.75
schwancr
Pande Group Member
Posts: 136
Joined: Wed Jun 01, 2011 9:45 pm

Re: Projects 7802 and 7803 on Advanced

Post by schwancr »

These projects have been expanded to include uniprocessor Linux and Win32 Clients v6+
schwancr
Pande Group Member
Posts: 136
Joined: Wed Jun 01, 2011 9:45 pm

Re: Projects 7802 and 7803 on Advanced

Post by schwancr »

These have moved to full fah.

Details here.
Post Reply