Projects 7800 - 7803 moving to full fah

Any announcements about FAH policy, servers and new projects will be made here.

Moderators: Site Moderators, FAHC Science Team

Post Reply
schwancr
Pande Group Member
Posts: 136
Joined: Wed Jun 01, 2011 9:45 pm

Projects 7800 - 7803 moving to full fah

Post by schwancr »

Projects 7800 - 7803 are moving from adv to fah:

Projects 7800/7801:

These projects attempt to explore how protein folding in the cell may be different than protein folding in a test tube. We are simulating a peptide inside the ribosome exit tunnel to explore how confinement and specific interactions within the tunnel can bias the peptide toward a certain fold or even prevent the peptide from folding. The two projects simulate two different peptides.

Projects 7802/7803:
These projects model the same proteins as above, but without the ribosome.


All four projects utilizes the A4 core and are available for Linux and Win32 SMP Clients v6.34+
As well as uniprocessor Linux and Win32 Clients v6+

Note that the deadline (and therefore the k-factor) has changed since moving from advanced.

STATS:
p7800
points = 1622.91
timeout = 24.12
deadline = 52.25
k-factor = 0.58

p7801
points = 1718.76
timeout = 25.54
deadline = 55.54
k-factor = 0.58

p7802
points = 1183.12
timeout = 17.58
deadline = 38.09
k-factor = 0.58

p7803
points = 1219.2
timeout = 18.12
deadline = 39.26
k-factor = 0.58
Post Reply