So, I've decided to start folding again after taking a 2yr haitus due to various hardware and internet connectivity issues.
In the past, I folded on pretty awful hardware and slowly earned the points. However, this time around, my hardware is a lot better (still far from ideal, though), and I'm running the beta SMP client with advmethods.
The good news is, I'm getting 1500 PPD on my laptop that I turn off on a regular basis, and that's only drawing 25W while acting as a small heater for my room.
However, I'm a bit weirded out by how I've gotten five consequetive P2669. They seem to have a very short deadline at 3 days while providing a huge amount of points (1920 / WU).
The project description tends to be a bit lacking, so I'm wondering if I may have some more insights to this.
- Why is the deadline so short? Is this some ultra-urgent project?
- Why am I getting so many of these? Same reason, lack of clients?
Project 2669?
Moderators: Site Moderators, FAHC Science Team
-
- Posts: 823
- Joined: Tue Mar 25, 2008 12:45 am
- Hardware configuration: Core i7 3770K @3.5 GHz (not folding), 8 GB DDR3 @2133 MHz, 2xGTX 780 @1215 MHz, Windows 7 Pro 64-bit running 7.3.6 w/ 1xSMP, 2xGPU
4P E5-4650 @3.1 GHz, 64 GB DDR3 @1333MHz, Ubuntu Desktop 13.10 64-bit
Re: Project 2669?
All SMP WUs have short deadlines, especially the ones that run on the a2 core (only run in Linux/OXS), at least compared to the uniprocessor client. They're can't be that urgent, inasmuch as any F@h project is not urgent, as evidenced by the fact that they've been around for at least a year (when I started Linux folding) and were probably been around a while before that (didn't pay much attention to the a2 WUs before Linux). Almost all the a2 projects are worth 1920 points, with the outliers earning even more; it's just the way the Pande Group benchmarked SMP WUs. SMP allows the Pande group to do more advanced simulations (I think) than a bunch of uniprocessor clients, so they reward that extra work with more points than if you ran as many uniproc clients as you have cores.
Both of the high-performance clients (SMP and GPU) have relatively short deadlines because they take advantage of advanced hardware, and the Pande Group can reasonably assume that they will be returned sooner. Since the deadlines are primarily to catch any lost WUs, they can assume that a WU is lost much sooner since they should finish a WU much sooner.
As to why you're getting so many 2669's...random luck. I've gotten a fair number of them as well, although I've been running the Linux client long enough that I've probably gotten several WUs from all the a2 projects.
Both of the high-performance clients (SMP and GPU) have relatively short deadlines because they take advantage of advanced hardware, and the Pande Group can reasonably assume that they will be returned sooner. Since the deadlines are primarily to catch any lost WUs, they can assume that a WU is lost much sooner since they should finish a WU much sooner.
As to why you're getting so many 2669's...random luck. I've gotten a fair number of them as well, although I've been running the Linux client long enough that I've probably gotten several WUs from all the a2 projects.
Re: Project 2669?
p2669's represent 55% of my a2's in the past 30 days.
getting 5 in a row does not seem that irregular.
getting 5 in a row does not seem that irregular.
Re: Project 2669?
Apparently you have not paid much attention to the Pande Group's explanations of urgency.Zagen30 wrote:All SMP WUs have short deadlines, especially the ones that run on the a2 core (only run in Linux/OXS), at least compared to the uniprocessor client. They're can't be that urgent, inasmuch as any F@h project is not urgent, as evidenced by the fact that they've been around for at least a year (when I started Linux folding) and were probably been around a while before that (didn't pay much attention to the a2 WUs before Linux). Almost all the a2 projects are worth 1920 points, with the outliers earning even more; it's just the way the Pande Group benchmarked SMP WUs. SMP allows the Pande group to do more advanced simulations (I think) than a bunch of uniprocessor clients, so they reward that extra work with more points than if you ran as many uniproc clients as you have cores.
Many of the WUs in a project must be run sequentially. A series of Gens is called a trajectory, and it is impossible to run Gen 196 of a Project-Run-Clone until somebody returns Gen 195 of that Project-Run-Clone. With a deadline of 3 days, let's take a wild guess and assume that the average time between when a server issues Gen N, the WU is processed and returned, and the server generates Gen (N+1) is about 2 days. I see at least one Run-Clone that has completed Gen 196. That means that to get to Gen 196, that trajectory has required 12.8 months to get this far along.
Is it reasonable to assume that the average time is 2 days? Probably not. Consider that every delay is cumulative and that a certain number of WUs are not returned by the deadline so they get reissued with a new 3-day deadline. I'm willing to bet that my guess was too optimistic. Nevertheless, if the science requires this many Gens, then the total time to run the project is a large sum of short, urgent steps.
I don't know how many Gens will be requried to complete this project, but you cannot assume that just because a project takes more than a year to complete, that each step along the way isn't urgent -- it just that the project requires a lot of computation.
Posting FAH's log:
How to provide enough info to get helpful support.
How to provide enough info to get helpful support.
-
- Posts: 823
- Joined: Tue Mar 25, 2008 12:45 am
- Hardware configuration: Core i7 3770K @3.5 GHz (not folding), 8 GB DDR3 @2133 MHz, 2xGTX 780 @1215 MHz, Windows 7 Pro 64-bit running 7.3.6 w/ 1xSMP, 2xGPU
4P E5-4650 @3.1 GHz, 64 GB DDR3 @1333MHz, Ubuntu Desktop 13.10 64-bit
Re: Project 2669?
Er, sorry about that. I know that turnaround time on individual WUs is important, I know about how each Gen produces the next Gen in that trajectory, etc. How would one define the urgency of a particular project, if not by how long it's been going?
-
- Posts: 53
- Joined: Fri Feb 08, 2008 4:24 pm
- Hardware configuration: 2 x X5550 Xeons - SuperMicro MBD-X8DAi-O
Server 2008 R2 x64 - 12GB Crucial DDR3 ECC Ram
PCP&C 910 Silencer - 1 x HIS 4850 ICEQ Turbo Edition
6 x E5530 Xeons (3 Systems) - SUPERMICRO MBD-X8DTL-i-O
Server 2008 RS x64 - 8GB DDR3 GSkill Non-ECC Ram
Seasonic 80+ Bronze 380w PSU
2 x E5504 - SUPERMICRO MBD-X8DTL-i-O
Server 2008 R2 x64 - 6GB DDR3 GSkill Non-ECC Ram
2.3 TB Raid 5 Array - Corsair 520 Power Supply
E5504 - EVGA X58 ATX Motherboard
Windows 7 x64 - 6GB DDR3 GSkill Non-ECC Ram
Seasonic 300 Power Supply
Intel X5550 CPU - EVGA X58 Micro ATX Motherboard
Windows 7 x64 - 3GB Corsair DDR3-1600
Corsair 550 Power Supply - ATI 4350
Dell Vostro 1500 Laptop - Intel T9300 C2D CPU
Windows 7 x64 - 4 GB DDR2-6400 - nVidia 8400m GS
Xeon 3075 C2D - Intel P35 Motherboard - 4GB DDR2 Non-ECC Ram
Server 2008 R2 x64- Seasonic 300 Power Supply - Location: Columbia, Tennessee
- Contact:
Re: Project 2669?
I would look at the deadline for each WU to determine the importance of the Work Unit to that particular project.Zagen30 wrote: How would one define the urgency of a particular project, if not by how long it's been going?
Project 2669 for example has been going for a year, but may be very important to the Pande Group.
The fact is they don't really state the "urgency" of each project.
We ,as a group, can only guess that shorter deadlines mean "needed quickly"
Otherwise, they would allow any CPU to run *any* work units but extending the deadlines.
By making the deadline short, they keep users from running them on lower hardware via no points awarded.
-
- Posts: 823
- Joined: Tue Mar 25, 2008 12:45 am
- Hardware configuration: Core i7 3770K @3.5 GHz (not folding), 8 GB DDR3 @2133 MHz, 2xGTX 780 @1215 MHz, Windows 7 Pro 64-bit running 7.3.6 w/ 1xSMP, 2xGPU
4P E5-4650 @3.1 GHz, 64 GB DDR3 @1333MHz, Ubuntu Desktop 13.10 64-bit
Re: Project 2669?
I would bring up some rebutting points, but I don't feel it'll get anywhere useful and this topic has already gone somewhat off-topic. I'll just reiterate that I fully understand and agree with PG's desire to get back WUs ASAP.
-
- Site Moderator
- Posts: 6359
- Joined: Sun Dec 02, 2007 10:38 am
- Location: Bordeaux, France
- Contact:
Re: Project 2669?
I guess it's time to read this article again : Why fast WU return >>> volume of WU returns
-
- Posts: 823
- Joined: Tue Mar 25, 2008 12:45 am
- Hardware configuration: Core i7 3770K @3.5 GHz (not folding), 8 GB DDR3 @2133 MHz, 2xGTX 780 @1215 MHz, Windows 7 Pro 64-bit running 7.3.6 w/ 1xSMP, 2xGPU
4P E5-4650 @3.1 GHz, 64 GB DDR3 @1333MHz, Ubuntu Desktop 13.10 64-bit
Re: Project 2669?