Project taking too long
Posted: Sat Feb 09, 2013 5:49 pm
Hi,
I've been contributing to FAH for about a month and never had troubles completing the work units before the preferred deadline, until now. I am working on Project 7809, which has base credit of 1722.50 points. On my machine, the ETA is 30 days, which means I won't be able to complete before the deadline. I'm not too eager to waste 30 days of my CPU, so is there any way to drop this?
I think there is some kind of issue with either my setup or the project, since before I completed 5000 point projects in a day or two.
Specs:
Intel Core i7-2670QM, 2.20Ghz, 4 cores, no OC
8GB Ram
Windows 7, updated
FAH 7.2.9
SMP, Project 7809
Thanks.
I've been contributing to FAH for about a month and never had troubles completing the work units before the preferred deadline, until now. I am working on Project 7809, which has base credit of 1722.50 points. On my machine, the ETA is 30 days, which means I won't be able to complete before the deadline. I'm not too eager to waste 30 days of my CPU, so is there any way to drop this?
I think there is some kind of issue with either my setup or the project, since before I completed 5000 point projects in a day or two.
Specs:
Intel Core i7-2670QM, 2.20Ghz, 4 cores, no OC
8GB Ram
Windows 7, updated
FAH 7.2.9
SMP, Project 7809
Thanks.