Project p6888 [Classic] on fah
Posted: Tue Jul 19, 2011 8:46 pm
Hi,
Project 6888 will soon be added to full fah. These are classic gromacs jobs and represent the second-stage configuration sampling of a single full-length amyloid beta (Abeta) familial mutant in water.
Points and deadlines info:
project 6888: 69 points, preferred deadline 14 days, final deadline 21 days
Thanks!
yslin
Project 6888 will soon be added to full fah. These are classic gromacs jobs and represent the second-stage configuration sampling of a single full-length amyloid beta (Abeta) familial mutant in water.
Points and deadlines info:
project 6888: 69 points, preferred deadline 14 days, final deadline 21 days
Thanks!
yslin