Page 1 of 1

Projects 7804-7807 on Advanced

Posted: Tue Jul 05, 2011 7:43 pm
by schwancr
New projects 7804-7807 are now on advanced.

These projects are identical to the previous series 7800-7803, except they are done at a different temperature.

Projects 7804/7805:
These projects attempt to explore how protein folding in the cell may be different than protein folding in a test tube. We are simulating a peptide inside the ribosome exit tunnel to explore how confinement and specific interactions within the tunnel can bias the peptide toward a certain fold or even prevent the peptide from folding. The two projects simulate two different peptides.

Projects 7806/7807:
These projects model the same proteins as above, but without the ribosome.

All four projects utilizes the A4 core and are available for Linux and Win32 SMP Clients v6.34+
As well as uniprocessor Linux and Win32 Clients v6+

Note that the deadline (and therefore the k-factor) has changed since the previous series (7800-7803). This should not affect your ppd.

STATS:
p7804
points = 1622.91
timeout = 24.12
deadline = 52.25
k-factor = 0.58

p7805
points = 1718.76
timeout = 25.54
deadline = 55.54
k-factor = 0.58

p7806
points = 1183.12
timeout = 17.58
deadline = 38.09
k-factor = 0.58

p7807
points = 1219.2
timeout = 18.12
deadline = 39.26
k-factor = 0.58