Project p6880 [Classic] on adv
Posted: Sat Nov 20, 2010 7:40 pm
Hi,
Project 6880 will soon be entering the advanced stage of testing.
These are classic gromacs jobs serving as the second-stage configuration sampling of a single full-length amyloid beta (Abeta) monomer in explicit water.
Points and deadlines info:
project 6880: 69 points, preferred deadline 14 days, final deadline 21 days
Thanks!
yslin
Project 6880 will soon be entering the advanced stage of testing.
These are classic gromacs jobs serving as the second-stage configuration sampling of a single full-length amyloid beta (Abeta) monomer in explicit water.
Points and deadlines info:
project 6880: 69 points, preferred deadline 14 days, final deadline 21 days
Thanks!
yslin